RACI Matrix

A RACI matrix clarifies responsibilities in projects. The rows are tasks or decisions and the columns are roles or people. Each cell says whether a role does the task (Responsible), owns it (Accountable), is consulted beforehand (Consulted) or informed afterwards (Informed). The team fills in the matrix together in real time and sees on every row whether exactly one A and at least one R are assigned.

How it works

  1. Create a room and share the link with the team.
  2. Add the roles or people involved as columns.
  3. Add the tasks and decisions as rows.
  4. Assign R, A, C and I in each row until no note is left.
  5. Download the finished matrix as CSV.

When should you use a RACI matrix?

Use a RACI matrix when several roles work on the same effort and it is unclear who does a task and who decides it. Typical triggers are a project kick-off, a new team setup, a process with handovers between departments and a dispute over who may make a decision. It also helps after an incident, when two roles each assumed the other one was taking care of it.

The matrix adds little for a team of two or three people who talk every day. Filling it in costs more time there than it saves in clarity. It does not replace planning either: it shows who is involved but not when something has to be finished. For dates and sequence you need a plan, which the matrix complements with responsibilities.

What do R, A, C and I mean?

R, A, C and I are the four functions a role can have in a task. R stands for Responsible and names who does the work. Several roles may be R when the work is split. A stands for Accountable and names who answers for the outcome and signs it off. Every task has exactly one A.

C stands for Consulted. These roles are asked for their view before the work or the decision. The exchange runs both ways. I stands for Informed. These roles hear about the outcome but have no influence on it. A role with no connection to the task stays empty.

The tool stores one letter per cell. If the person who does the work is also accountable, give that person the A and name the role that assists as R.

How do you check a RACI matrix for gaps?

A row is complete when it has exactly one A and at least one R. The tool checks every row against this rule and shows a note when there is no A, more than one A or no R. A missing A means nobody answers for the outcome. Several A suggest that the decision has been disputed so far. A missing R means someone feels responsible for the task but nobody does it.

A second look goes to the columns. A role with an R in almost every row is probably overloaded. A role with only I may have no task in the project and just needs the results. A row with many C demands many consultations and slows the decision down.

RACI matrix example: relaunching a company website

The example shows a RACI matrix for relaunching a company website. Team, roles and tasks are invented.

Every row has exactly one A and at least one R. For the requirements, management answers for the outcome while project management gathers them. For the go-live approval, management decides, project management executes it and the legal department is consulted beforehand. Development performs only one task and is consulted on the others.

TaskProject mgmtDevelopmentDesignLegalManagement
Gather requirementsRCCIA
Draft the layoutACRII
Build the pagesARCII
Review the privacy noticeACIRI
Approve the go-liveRCICA

How do you facilitate a RACI workshop?

A RACI workshop works when everyone edits the same matrix at the same time and the tasks are settled beforehand. It works well remotely because every change appears for everyone at once and an open voice call replaces the side conversations that happen around a table.

  • Collect tasks and decisions before the session so the workshop starts with assigning.
  • Work row by row and clarify the A first in each row, because the other letters follow from it.
  • When people disagree about the A, ask who has to answer if the task fails.
  • Use roles as columns instead of names when people on the project may change.
  • Assign C sparingly and ask for each C whether the task would stall without that consultation.
  • Invite guests and executives as observers so they can follow along without changing the matrix by accident.
  • Download the CSV file at the end and store it with the project files.

What mistakes are common with a RACI matrix?

The most frequent mistakes concern the A and the number of people involved. A matrix in which every role gets a letter for every task no longer shows who is responsible. These mistakes can be avoided:

  • Two A in one row: agree on who takes the responsibility and remove the second A.
  • A committee as the A: a meeting can advise but nobody can hold it to account. Name one person or one role.
  • Too many C and I: every C means a consultation and every I a message. Remove what can go without consequences.
  • Tasks that are too coarse or too fine: "run the project" says nothing and "fix a comma" fills the matrix. A task with a result of its own fits.
  • Filling it in once and filing it away: responsibilities change with the project. A review at the start of each project phase keeps the matrix current.

RACI vs. DACI: what is the difference?

RACI assigns roles to many tasks while DACI assigns roles to a single decision. DACI stands for Driver, Approver, Contributors and Informed. The driver pushes the decision forward and the approver signs it off.

Use DACI to close one open decision. Use RACI to clarify responsibilities for a whole effort. A common variant is RASCI, which adds an S for Supportive to cover a role that assists.

AspectRACIDACI
SubjectMany tasks and decisions in one matrixOne single decision
RolesResponsible, Accountable, Consulted, InformedDriver, Approver, Contributors, Informed
Who decidesThe role with the A answers for the outcomeThe approver signs off the decision
UseClarify responsibilities in a project or processClose one open decision

Key terms

Responsible
The role that executes a task. Several roles can be R on the same task.
Accountable
The role that answers for the outcome and signs it off. Every task has exactly one A.
Consulted
A role asked for its view before the work or the decision. Communication runs both ways.
Informed
A role that is told about the outcome. Communication runs one way only.
RASCI
An extension of the RACI matrix with an S for Supportive. It marks roles that assist the role doing the work.
DACI
A model for single decisions with the roles Driver, Approver, Contributors and Informed.

Frequently asked questions

What do R, A, C and I stand for?
R stands for Responsible, the role that does the task. A stands for Accountable, the role that owns the outcome and signs it off. C stands for Consulted, these roles are asked for their view beforehand. I stands for Informed, these roles hear about the outcome without working on it.
Why only one A per task?
With exactly one accountable role it is clear who decides in the end and who to ask when something goes wrong. Two A often mean that nobody feels in charge. That is why the matrix shows a note on every row with no A or more than one A. The same applies when nobody does the task yet.
How do I fill in the matrix?
Clicking a cell cycles through R, A, C, I and empty. On the keyboard the keys R, A, C and I set the value directly, Delete clears the cell and the arrow keys jump to the neighbouring cell. Everyone in the room sees each change immediately.
Can people just watch?
Yes. Anyone who joins the room as an observer sees the matrix and every change live but cannot add, move or delete anything. This suits managers or guests in a workshop. The role can be switched in the room at any time, so an observer can join the work later on.
Is the matrix stored?
The matrix exists only in the room on the server. Once everyone has left the room it is deleted after a short while along with all roles and tasks. That is why there is the CSV download, which saves the matrix including the notes in a file you can open in Excel.
How many roles fit in a RACI matrix?
The tool allows up to 20 roles and 60 tasks. In practice a matrix stays readable with five to ten roles. If it grows wider, it pays to merge roles or to split the matrix by sub-project so that every row can still be read at a glance.
Can the same person be R and A at once?
In principle yes. In small teams it happens often. In the tool each cell holds exactly one letter. Give the accountable person the A and add a separate column with an R for the role that does the work. That way the row check for exactly one A and at least one R passes.
What is the difference between RACI and RASCI?
RASCI adds an S for Supportive to RACI. These roles assist the role doing the work without executing the task themselves. The tool offers the letters R, A, C and I. If you need RASCI, enter the assisting role as C and note the difference in the conversation.
Does every row need a C or an I?
No. The row check requires only exactly one A and at least one R. Whether someone has to be consulted or informed depends on the task. A routine internal task often needs neither, while a decision that affects other departments usually has several C and I.
How do I create a RACI matrix for a project?
First collect the tasks and decisions of the project as rows. Then add the roles involved as columns. Next assign R, A, C and I row by row and start each row with the A. When the row check shows no more notes, the matrix is complete.
Who decides who gets the A?
The team settles it together in the workshop, usually with the sponsor or the project lead. The A goes to the role that answers if the task fails and has the authority to sign off the result. Settle any disputed row before you release the matrix to the wider group.